HS Suggestion 2023 for Costing and Taxation (XII) West Bengal board of Secondary Education By Imbookish Class 12
Exam Name | Higher Secondary Examination (Class 12) |
Subject | Costing & Taxation |
Approximate Common in 2022 | 90% Must Common |
Board | WBCHSE |
HS Costing Taxation Suggestion WBCHSE
HS 2023 Costing Taxation Exam Date WBCHSE:
The most effective method to Get Good Marks in Costing Taxation Exam WBCHSE:
- After Test Exam, practice test paper exceptionally true inquiry should be adequately cleared.
- Settle the tricky inquiry.
- Give mock test for multiple times after test.
- Khata Presentation with great hand composing will be exceptionally useful for HS Costing Taxation 2023 test.
- Follow composing style of Rank understudy in Class.
- Before Final test, Bengali subject should be reconsidered multiple times.
- Khata Presentation, Writing Technique, Handwriting Style are more fundamentals to rank in West Bengal Higher Secondary Costing Taxation 2023 Exam.
- Make an arrangement as per various imprints division before work out last, most important test. I need to say make a rundown of what you will do at the clench hand half and final part of first hour. Then, at that point, second and third.
- In assessment lobby overhaul of twice will be sufficiently useful. first Revise : Check spelling botch. second Revise: Add or eliminate answers actually any place it is required.
- To the Point Answer with lucidity should be a significant piece to get great imprints in Costing Taxation test.
Commerce Student Suggestion WBCHSE:
WBCHSE
Higher Secondary Examination 2023 Costing Taxation Suggestion Demo WBCHSE:
COST OF LABOUR OR WAGES
STANDARD TIME
1.
A Work measurement study was conducted in a
manufacturing firm for 8 hours and the following results were obtained :
Units Produced
320 |
Idle Time
15% |
Performance Rating
120% |
Allowance Time 12%
Of Standard Time |
|
What is the Standard Time For Job ?
ANSWER :- STANDARD TIME 1.738 MINUTES PER UNIT.
2.
A Work measurement study Carried out in a Firm
For 8 hours and the following
information was available :
Units Produced
40
|
||||||
Performance Rating
80% |
||||||
Idle Time
10% |
||||||
Allowance Time
10% Of Standard Time |
||||||
What is the standard time for the task?
ANSWER :- 9.6 MINUTES PER UNIT.
3. Calculate standard Labour Time for
machinery part no. 1240 from the following data :
|
ANSWER :- Standard Time per piece = 18 minutes
Long questions are added